PHOTOS 12 / FINAL PHOTOS OF CONTROL ROOM/ RECORDING BOOTH |
WELL ITS FINISHED , BOTH ROOMS, JUST LITTLE THINGS BUT ITS ALL DONE. HALF OF THIS PROJECT IS BEHIND ME. VERY EXCITED. A LOT OF STUFF I HAD TO GO THROUGH IN THE PROCESS OF ... Posted by TORQUE on Tue, 22 Apr 2008 06:52:00 PST |
PHOTOS 11 / BUILDING THE STUDIO |
WELL FINISHED ALL THE MOLDINGS IN ALL THE ROOMS. FINISHED POLYING THE FLOORS, LAQUERED THE DESKS, AND DOORS. FINISHED ALL THE PAINTING IN THE CONTROL ROOM AND BOOTH. NOT PAINTING THE HALLW... Posted by TORQUE on Sun, 23 Mar 2008 07:08:00 PST |
PHOTOS 10 / BUILDING THE STUDIO |
INSTALLED THE HARDWOOD FLOOR IN CONTROL ROOM, HALLWAY , RECORDING BOOTH.
Posted by TORQUE on Sun, 27 Jan 2008 07:45:00 PST |
PHOTOS 9 / BUILDING THE STUDIO |
THE UNDERNEATH OF THE DESKS ARE ALL DONE. I PLASTERED AND PRIMED THEM. THE RIGHT SELF IS DONE TO. STARTED PREPING THE FLOOR , COVERING IT WITH LUNNON FIRST AND FLOOR LEVEL. PUTTING T... Posted by TORQUE on Tue, 22 Jan 2008 10:02:00 PST |
PHOTOS 8/ BUILDING THE STUDIO |
ALL THE FINISHED WORK ON THE DESKS TOP PART IS DONE, AND I ALSO FIFNISHED BOTH SHELVES, I DIDNT TAKE PHOTOS OF THE RIGHT SHELVES. I AM MOVING ON TO PLASTERING THE BOTTOM OF THE DESKS, I DECIDED ... Posted by TORQUE on Thu, 20 Dec 2007 07:32:00 PST |
PHOTOS 7 BUILDING THE STUDIO |
PICS OF THE WALLS AND CEILINGS WITH 2 COATS OF PRIMER . ALL THE NEW ELECTRIC IS HOOKED UP AND THE NEW CIRCUIT BREAKER BOX IS INSTALLED. STARTED WORKING ON THE DESK SAND BOTTOM SHELVES IN TH... Posted by TORQUE on Tue, 20 Nov 2007 07:18:00 PST |
PHOTOS 6/ BUILDING THE STUDIO |
HERE ARE THE NEW PHOTOS, THE MOST RECENT OF WHAT IT LOOKS LIKE TO DATE.
ALL THE PLASTERING IS DONE ON THE WALLS AND CEILINGS, DECIDED TO ADD MOLDINGS IN THE HALL WAY , AND DOO... Posted by TORQUE on Sat, 27 Oct 2007 04:21:00 PST |
PHOTOS 5/ BUILDING THE STUDIO |
ALL THE SHEETROCK IS UP IN THE CONTROL ROOM, RECORDING BOOTH AND HALL WAY, STARTED THE FIRST COAT OF PLASTER AND SECOND . WILL BE PUTTING THE CORNER BEEDS UP AROUND THE WINDOWS AND D... Posted by TORQUE on Tue, 04 Sep 2007 05:51:00 PST |
PHOTOS 4/ BUILDING THE STUDIO |
GOING REALLY WELL , YOU CAN GO CHECK OUT THE NEW PHOTOS ON PHOTOS 4 IN MY PICS. FINISHED ALL THE SOUNDBOARD IN THE CONTROL ROOM , BOOTH AND HALLWAY. FINISHED PUTTING UP THE NEW CEILL... Posted by TORQUE on Mon, 13 Aug 2007 05:58:00 PST |
PHOTOS 3 OF STUDIO |
SHOWING ME PUTTING THE FINAL SHEETS OF SOUNDBOARD IN THE CONTROL ROOM, AND OUTSIDE THE CONTROL ROOM AND RECORDING BOOTH. ALSO ALL THE ELECTRIC WIRES RUN AND NAILED UP IN BOTH ROOMS.ALSO THE ... Posted by TORQUE on Tue, 10 Jul 2007 05:04:00 PST |